- EMS ISD Bond Progress
- Boswell High School
-
January 2022 Construction Photos
-
December 2021 Construction Photos
-
November 2021 Construction Photos
-
September 2021 Construction Photos
Pictured above left is the memorial sign for the BHS baseball complex. Pictured above middle is the fencing surrounding the stadium grandstand. Pictrued above left is the stadium handrails.
Pictured above left, progress continues on the turf room. Pictured above middle, the turf for the turf room will soon be laid. Pictured above right, the landscaping at the stadium is nearing completion.
Pictured above left, the lparking ines have been drawn for buses. Pictured above, construction continues for the pressbox. Pictured above right, construction workers continue work inside the pressbox.
-
August 2021 Construction Photos
Pictured above left is the BHS gymnastics area. Updates are completed. Pictured above middle is the coaches' parking area. Pictured above right is the Newcom gym. Wood floors have been resurfaced.
Pictured above left is the coaches' office area. Updates are completed. Pictured above middle is the stadium. Press box construction is underway. Pictured above right is the tennis court contruction progress.
Pictured above left is the construction progress of the turf room. Pictured above right is the completed weight room.
-
July 2021 Construction Photos
Pictured above from left are a view of the athletics building and the visitor’s bleachers main concourse retaining wall.
Pictured above from left are a view of the football field and visitor's bleachers.
Pictured above from left are the pressbox and main walkway between the field and dressing rooms.
Pictured above is the pressbox.
-
June 2021 Construction Photos
From left, stadium construction progresses and stadium masonry columns have been completed.
from left, concrete flatwork needs to be completed before the granstand install can begin. Bleacher pier drilling has resumed. Pictured below, wall tile work in the shower rooms has completed. -
April 2021 Construction Photos
The photos above show the stadium CMU blocks completion, visitor's stands demolition, turf room construction, and the last structural beam before being signed by students.
-
March 2021 Construction Photos
The photos above show construction taking place for the Boswell High School stadium.
-
February 2021 Construction Photos
Pictured from left show grandstand piers and retaining wall that has been completed, then the turf room slab and CMU block work that is in progress. Finally the photo to the far right shows the gymnastics new locker room space and additional storage in progress.
-
November 2020 Construction Photos
Stadium demolition continues at the BHS stadium. A ramp was installed near the gymnastics area.
-
October 2020 Construction Photos
(Left) The first section of grade beams have been poured. (Right) Grade beams for the locker room area are under construction.
-
September 2020 Construction Photos
(Left) The lanscaping is complete on the Kenneth K. Reed Agriculture-Science Building. (Right) Drilling piers are installed at Pioneer Stadium.
-
July 2020 Construction Photos
Top row: Masonry is being completed on the agriculture building. Next, a classroom is in the process of being completed. Second row: Ag building lab is being finalized. The ag building office is being completed. Bottom row: Bathroom tile is being installed in the Ag buildin. Utilities are being worked on.
-
May 2020 Construction Photos
Ag Science building concrete masonry blocks are progressing.
-
April 2020 Construction Photos
The new electrical routing is complete.
-
March 2020 Construction Photos
-
February 2020 Construction Photos
-
October 2019 Construction Photos
-
September 2019 Construction Photos
-
August 2019 Construction Photos
-
July 2019 Construction Photos
-
May 2019 Construction Photos