August 2020 Construction Photos
-
July 2020 Construction Photos
Pictured below: A district staff member waxes the floors. Cafeteria graphics have been installed. The gym floor is complete. The conference room is ready for use.
-
June 2020 Construction Photos
Pictured above from left, concrete is being prepped for flooring. The Hat channel is being installed to recieve acoustical panel.
Pictured above from left, the playground area will be lanscaped. Classrooms are ready for furniture.
Pictured above, signage has been installed.
-
May 2020 Construction Photos
Pictured above from left, ceiling clouds are being installed. Duct work and lighting are being installed in the tornado structure.
Pictured above from left, work is progressing at Copper Creek Elementary School and will open on time in August 2020. Masonry on the gym walls are progressing.
Pictured above from left, the playground structure is installed. Sidewalks are progressing between the academic wings.
-
April 2020 Construction Photos
Pictured above from left, hallways are painted and construction continues on the building. Pictured below, the library circulation desk is complete.
-
March 2020 Construction Photos
-
February 2020 Construction Photos
-
January 2020 Construction Photos
-
December 2019 Construction Photos
-
November 2017 Construction Photos
-
October 2019 Construction Photos
-
September 2019 Construction Photos
-
August 2019 Construction Photos
-
July 2019 Construction Photos
-
May 2019 Construction Photos
-
March 2019 Construction Photos