Bryson Elementary School

  • Renovations are underway at Bryson Elementary School.

    August 2019 Update:

    • New front stone and brick entrance.
    • New stone in the back of the gym.
    • Finishing touches are underway in the gym.
    • New tile and serving line with new cafeteria tables. New flooring is being installed on the hallway leading into the gym.
    • New fencing and well house structure.
    • New dumpster enclosure.
    • New outside basketball court and playground with covers.

    July 2019 Update:

    • New moisture barrier installed on exterior and areas prepped for stone.
    • Tile installed in the new kitchen serving line.
    • New hallway added to gym entrance.
    • Tiling is underway in the gym and iron work is being installed.

     May 2019 Update:

    • West side of gym wall has been demolished.
    • Well house has been demolished.
  • September 2019 Construction Photos

  • August 2019 Construction Photos

  • July 2019 Construction Photos

  • May 2019 Construction Photos